AI Summary
Description
1.1 SCOPE: The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to install (12) government furnished streetlights with mounting arms at USCG Base Cape Cod XXXXXX in Bourne, MA 02542. 1.1.2 REQUIRED WORK: This list should not be considered complete. It represents the general items needed to complete the contract requirements. The Contractor shall secure power to existing fixtures and dispose. The Contractor shall install (12) new government furnished streetlights with mounting arms at existing locations to be determined by the COR upon contract award. The Contractor shall provide new hardware for installation as needed. The Contractor shall make all required electrical connections as needed. All work shall be performed in accordance with applicable State and Federal regulations. Electrical shall be provided by the U.S. Coast Guard Contractor in accordance with NFPA 70 National Electrical Code. All electrical work shall be straight, plumb, and level. The Contractor shall provide (12) complete working streetlights upon completion. SEE SCOPE OF WORK FOR FULL DETAILS
Classification
Place of Performance
Contracting Office
Contacts
Attachments (3)