AI Summary
Description
SOURCES SOUGHT NOTICE Project Description : Grand Island Mitigation Project Anticipated Posting Date: 09 October 2026 Sources Sought Number: W9123827X1CQX SAM Posting Title : USACE SPK DBB Construction – Grand Island Mitigation Project – Sacramento, California SAM Posting Description : This Sources Sought Notice is being issued for market research purposes to determine the availability, capability, and interest of small business firms for a potential Government requirement. NO SOLICITATION IS AVAILABLE; requests for a solicitation will go unanswered. No award will be made from this Notice. Responses will be used to determine potential acquisition strategies, understand current market capabilities, and to gain knowledge of potential sources. GENERAL SCOPE: The Sacramento River Grand Island Mitigation Project is a restoration initiative on a 233-acre site located at the western tip of Grand Island in Sacramento County, California, situated at the confluence of the Sacramento River, Steamboat Slough, and Cache Slough. The project is designed to create and enhance approximately 84 acres of self-sustaining aquatic and riparian habitat as compensatory mitigation for the American River Common Features (ARCF) project. The construction scope entails approximately 108,000 cubic yards of total excavation to establish a tidal channel network and create an interior "habitat bowl" with islands and peninsulas, alongside breaching an existing berm to connect the site to Steamboat Slough. Excavated material will be utilized to construct on-site features such as the islands and peninsulas, while the remaining excess material will initially be placed in designated uncompacted fill areas on the island and, if settlement issues arise, hauled off-site by barge. To support the federally listed Western, Yellow-Billed Cuckoo, the revegetation plan establishes a continuous riparian corridor by planting water-tolerant trees and shrubs at lower elevations, transitioning to diverse, later-successional trees and native grasses at higher elevations. Project features also include protecting the Valley Elderberry Longhorn Beetle by transplanting impacted elderberry shrubs to designated on-site areas, followed by irrigation and maintenance of these transplants for the duration of this contract. To stabilize the breach, the design utilizes a hybrid bioengineered approach featuring a quarry stone riprap toe from the channel inverted up to 4 feet, transitioning to a bioengineered slope reinforced with erosion control fabrics and live willow cuttings above. Construction scheduling is subject to strict environmental windows, requiring all in-water work (such as activities in Steamboat Slough) to occur strictly between July 1st and October 31st. To isolate the breach work area from the active waterway during in-water construction, a temporary 250-foot-long steel sheet pile cofferdam must be installed and then fully removed upon project completion. The potential requirement may result i…
Classification
Place of Performance
Contracting Office
Contacts