AI Summary
Description
This project consists of the reroofing of the historic UTE Tower on the Ashley National Forest. B. Work includes: 1. Remove and dispose of existing cedar wood shingle roofing system. 2. The existing plywood sheathing to remain. 3. Remove & reinstall the lightning protection rod, lightning protection cables across the roof, clamps & fasteners across the roof, and appurtenances across the roof. 4. Install a multi-width synthetic cedar shingle roofing system as specified in Specification Section 073129 SYNTHETIC CEDAR SHINGLES, and as per manufacturer's instructions, to include matching synthetic cedar ridge caps on each of the 4 ridges. 5. Work includes the installation of the roofing felt and self-adhering ice shield underlayment over the entire roof, the flashing, the synthetic shingles, the synthetic ridge caps, and all necessary fasteners and accessories. Flashing shall be galvanized steel, no sheen, mill finish. 6. Metal Work: Fabricate and install a matching stove pipe sleeved flashing piece, to match existing material and dimensions. Within that new sleeved flashing piece, reinstall the salvaged stove pipe w/ flashing to match
Classification
Place of Performance
Contracting Office
Contacts