AI Summary
Description
ATS EcoTower C1D2/26 ? Pneumatic, Skid-Mounted Safety Shower and Eyewash Station (or Equal) Primary Purpose: To provide rapid, compliant, and self-contained emergency decontamination (shower and eye/face wash) in remote locations or harsh environments lacking a potable water source, specifically within hazardous areas. ________________________________________ ���� Core System and Compliance Standards ? Safety Compliance: Must be fully compliant with ANSI/ISEAZ358.1 (2014) standards for emergency eyewash and shower equipment, ensuring continuous flow capabilities ? Electrical Hazard Classification: Must be certified for Class I, Division 2 (C1D2) hazardous locations to prevent ignition risks in environments where flammable gases or vapors may be present________________________________________ � Water Capacity and Thermal Regulation ? Fluid Capacity: Must include an integrated, heavy-duty insulated water storage tank with a minimum capacity of 325 gallons to guarantee a minimum of 15minutes of continuous tepid water flow. ? Tepid Water Delivery: Must feature an integrated, electrical immersion heating system (minimum 1,200 Watts) to actively maintain stored water temperatures above the ANSI-mandated minimum of 60�F (15.6�C) in freezing or cold-weather conditions ? Freeze Protection: Must utilize a self-regulating heat trace system to protect plumbing and supply lines from freezing down to an ambient operating temperature threshold of 0�F (-17.8�C) ________________________________________���� Pneumatic Operation and Mechanical Specifications ? Pumping System: Must utilize a pneumatically driven transfer pump (rather than electric) to deliver pressurized water to the showerhead and eyewash . This ensures complete spark-free operation in C1D2 zones and allows the unit to safely function during electrical outages via pneumatic backup ?Pneumatic Air Source Input: Must support a shop air compressor supply or specialized nitrogen tank supply with an operational pressure range of 60 to 120 PSI (recommended regulator set to 80 PSI) ? Flow Rates: ? Shower: Must deliver a regulated flow rate of at least 20 GPM (76 LPM) ? Eyewash: Must deliver a regulated flow rate of at least 0.4 GPM(1.5 LPM) with an integrated protective dust/debris cover________________________________________ ���� Structural and Mounting Specifications ? Skid-Mount Design: Must be built on a heavy-duty, corrosion-resistant, powder-coated steel skid frame designed for rapid deployment, positioning by forklift/crane, and high-wind structural stability. ? Footprint and Portability: Must maintain a compact, space-saving footprint suitable for deployment in tight industrial spaces, remote airfields, or forward operating environments ? Material Durability: All critical external piping and the showerhead assembly must be constructed from durable stainless steel or equivalent corrosion-resistant materials. ? Controls and Activation: Must feature a highly visible, easy-to-reach mechanical pull-hand…
Classification
Place of Performance
Contracting Office
Contacts