This project consists of replacement of the sewer line and related repair work on the Big 1.2 Piney Ranger Station on the Bridger-Teton National Forest (NF). The facility is operated by the Bridger-Teton NF on the Big Piney Ranger District in Big Piney, Wyoming. Work will include demolition of finished flooring as needed, demolition of concrete slab along 81' of sewer line, disconnection of 17 plumbing fixtures, replacement of sewer line, patching of concrete slab and replacement of aggregate, reconnection of 17 plumbing fixtures, and replacement of finished flooring. Work includes the removal and proper disposal of all demolished materials. The contractor shall provide all required materials. Quotes should describe the method that will be used to replace the sewer line, and what areas will be effected by related demolition work.